+86-13535848691    yoyo@jysteelstructure.com
You are here: Home / Prefab Building Kits / Prefabricated K House / Temporary K Type Prefab House

loading

Share to:
facebook sharing button
twitter sharing button
line sharing button
wechat sharing button
linkedin sharing button
pinterest sharing button
whatsapp sharing button
sharethis sharing button

Temporary K Type Prefab House

Availability:
Quantity:

Product Information

Prefab houses are typically constructed off-site in a factory and then transported and assembled at the construction site.


The specific features and design of a "K type prefab house" are because the size of the prefabricated house can be described by K(K=1820mm). Generally, it may use light steel frames (such as C-section steel) and EPS (polystyrene) sandwich panels as the main building materials. These houses are designed to be easily assembled and disassembled with the bolts connecting methods.


The advantages of prefab houses include quick construction and cost-effectiveness. They are commonly used for temporary housing, modular buildings, or as an alternative to traditional on-site construction.


Prefabricated house K-type (slope roof) project display

prefab house prefab house prefab house

Prefabricated K House Area Formula

Grand total Area formula=a+b+c+d(option)

a.Floor area=(width+0.16m)*(length+0.16m)*storey

b.Aisle area=length+0.16m

c.Rain cover area=0.5*(length+0.16)

D.Stairs area: 2 layer=4.5sqm, 3 layers=16. 4sqm  


Main Feature:

1. The unit figure for K house dimension is K, 1K=1.82m, K is the distance between the two closest columns.

2. K house can be built as 1 to 3 floors building. Figures for houses with different stories: One floor=3P, two floor=6p, three floor=9p

3. K house is qualified for waterproof, fireproof, heat insulation, and sound insulation performance.

4. K house can be relocated to different site, It can be assembled and disassembled six times.

5. K house is anti-termites. All steel structures are well painted and anti-rust which can be normally used for 10~15 years, and all materials can be recycled.

6. K house only requires a level concrete floor for the foundation.

7. 4 labors one team, can install more than 200 per day.


Prefab house floor plan & elevation plan

K type prefab house

prefabricated house


Prefabricated house (K type) installation process:

A) Site Preparation: Clear the construction site and make sure it is level and do not have any debris or obstructions.

B) Foundation installation: This may involve pouring a concrete slab, building a concrete ring beam, or setting up a raised platform.

C) Delivery and Unloading: Arrange delivery unload the components (house building material)from shipping container or a truck, ensuring proper handling and safety precautions.

D)Assembly of Structural Frame: First assemble the structural frame of the house. This usually involves joining steel columns, beams and C-purlins according to the manufacturer's instructions. Use appropriate fasteners such as bolts, screws, or welds to secure the connection.

E) Wall and Roof Installation: Installing prefabricated wall and roof panels to the structural frame.

F) Door and window installation: Make holes in the wall panel according to the door and window requirements. Install doors and windows according to the manufacturer's instructions, ensuring proper sealing and weatherproofing.

G) Electrical and Plumbing: Install electrical and plumbing systems according to the design of the home and local building codes. This may involve running electrical wiring, installing sockets, switches and fixtures, and installing pipes, sinks, toilets and showers.

QQ截图20150715154225

Application:

• Worker Dormitories, Staff Quarters, and Executive Dormitories

• Fitness Centers

• Gymnasiums

• Movie Theaters

• Commissary

• Cafeteria-Style Dining

• Food Storage, Preparation, and Serving Areas

• Shower and Locker Rooms

• Medical Shelters and First-Aid Clinics

• Laundry Facilities

• Offices, Business Centers, Conference Rooms


Prefab house indoor display: (with & without ceiling)

prefab house prefab house

Prefabricated K house component

They built using prefabricated components, such as sandwich panel walls, plywood/cement board floors, sandwich panel roofs, and related accessories which are pre-manufactured in a factory. These components are then transported to the site where they are easily and quickly assembled to create the final structure.


Product Material List

No.

Item

Specification

Reference pic

Remarks

1

Ground beam  

C78x38x15x1.5mm

Paint

2

Column                  

Double C78x38x15x1.7mm

Paint

3

Ring beam        

C78x38x15x1.5mm

Paint

4

Corner column

Double C78x38x15x1.7mm

Paint

5

Floor Purlin

C78*38*15*1.5mm

Paint

6

Herringbone beam

C78*38*15*1.5mm

Paint

7

Roof purlin

1.4mm L angle

Paint

8

Gable wall roof beam

C78*38*15*1.5mm

Paint

9

Canopy steel frame

C50*1.2mm, steel sheet

Paint

10

Wall panel

50mm EPS Sandwich panel               (steel sheet thickness 0.326mm)

EPS density: 10kg/m³

11

Roof panel            

50mm EPS Sandwich panel               (steel sheet thickness 0.326mm)

EPS density: 10kg/m³

12

Window                  

PVC sliding window

single glass

13

Entrance Door                            

EPS sandwich panel door

 

with locks

14

Accessories        

nail,screws,glue,trimming,etc                          

  


  



Advantages

1. Activity: removable and reusable.

2. Rapid assembly: short manufacturing period and no foundation.

3. Steel-reinforced structure, safety, windproof and shockproof.

4. Durability: the outer wall of the steel plate is corrosion-resistant and acid-resistant and does not rust or crack, and its service life is more than 20 years.

5. Sound and heat insulation: It adopts an air-heat insulation design, with good sound and heat insulation.

6. Aesthetics: It can be designed in various shapes, with many colors on the outer wall, and a bright and beautiful appearance.

7. Low cost, high quality, and low price.


Prefab house container loading method

Choosing the right container loading method is very important for transporting and storing prefabricated houses. It maximizes the integrity and quality of the prefab house and also increases the efficiency of transportation and storage rates. Our most commonly used container loading method is to load steel structures at the bottom of the container, and load wall panels or roof panels on top of the steel structures. In this way, the combination of steel structures and panels is the most reasonable in terms of space and weight.

loading

Why Choose Us?

1. Our people

Our engineers are very professional, and most of them have more than 10 years of experience in the architecture field.

Our work staff have steel structure processing excellent skills. Some of them even have overseas installation experience.

Our colleagues in the sales team are all passionate about their work and honest and humble towards our customers. Every inquiry or email will be replied to in time. Every question will be paid high attention.


2. Our service

We offer recommendations for our customers in the pre-sale stage.

We offer floor plans, elevation plans, and quotations for free.

We offer construction drawings, and calculation sheets to help you get a construction permit after the order is confirmed.  

We offer detailed foundation and Installation drawings after delivery.

We offer details packing lists for every container when loaded so it will be easier to check and get the materials. Form A, Form E, and CO certificates are available.


3.Our Global Market

We have supported government projects in Russia, Australia, Malaysia,  Niger, Kenya, Fiji, Philippines and other projects in more than 30 countries.


FAQ

1. I need to build a prefab house but the only information I have is the floor area. Can you help us design it?

If the customer does not have formal drawings, we can help him design according to his floor area and functional uses, and recommend suitable materials according to his budget.


2. Is it convenient if I arrange some goods from other suppliers that I need to send to your factory to ship together?

It is possible, that we can understand the shipping cost is expensive, and we can help to load your other goods into your container.


3. If I want to use floor decking, can you provide concrete and steel bars together?

We recommend that customers purchase steel bars and pour concrete locally because this is part of civil construction and it requires the use of cranes and concrete mixers. We provide floor decking and shear studs.





Previous: 
Next: 

QUICK LINKS

PRODUCT CATEGORY

CONTACT US

 +86-13535848691
 Workshop 2-2, No. 2, Changyaogang, Lutang, Yanghe Town, Gaoming District, Foshan, China

FOLLOW US

Subscribe Now
Subscribe
Leave a Message
Contact Us
Copyright © 2023 Guangdong Junyou Steel Structure Co., Ltd . All Rights Reserved.